Vallecito Dam Construction Project

Pages

Excavation of additional cut-off trench (4)
Excavating additional cut-off trench through embankment placed in 1938. Taken from point 25 feet upstream from dam axis at station 17+00., Original photo number: Pine R - 099
Excavation of additional cut-off trench (5)
Excavation for additional cut-off trench, looking toward left abutment from axis sta. 14+90. Excavation is practically complete. Junction with secondary cut-off is at rear end of shovel. Refer to Pine R - 183., Original photo number: Pine R - 100
Excavation of additional cut-off trench (6)
Excavation of additional cut-off trench looking toward right abutment from axis sta. 16+50. Right side of cut is in primary cut-off trench placed in 1938. Shovel is working in original foundation material. Refer to Pine R - 182., Original photo number: Pine R - 086
Excavation of additional cut-off trench (7)
Excavation for additional cut-off trench, looking toward right abutment from axis station 16+75. Excavation is complete and bottom of trench is a minimum of 6 ft. into glacial till. Refer to Pine R - 188., Original photo number: Pine R - 103
Face of Borrow Pit cut
Face of cut in Borrow Pit No. 1 at station 120+50/45+00. A full face cut will be taken here to obtain No. 2 (impervious) material., Original photo number: Pine R - 216
Face of cut at right side of spillway
Face of cut at right side of spillway between stations 5+65 and 5+84. Note grout leaks resulting from grouting of cut-off wall at station 5+84. These leaks were caulked and successfully sealed., Original photo number: Pine R - 346
Far-away view of dam
View of dam looking upstream from a point approximately 3/4 mile away., Original photo number: Pine R - 060
Filling embankment
Placing material (clay ) from Borrow Pit No. 1 in Zone 2 of the embankment. The material was close to optimum moisture. Note the excellent condition of the fill for hauling., Original photo number: Pine R - 066
Filling spillway expansion joints
Pouring a hot mixture of latex and road oil in expansion joint in spillway floor., Original photo number: Pine R - 441
Finishing concrete floor panel
Concrete finishers troweling center floor panel between stations 6+90 and 7+25., Original photo number: Pine R - 359
Flattening the embankment
Rolling Zone 2 (clay ) material from Borrow Pit No. 1 at station 13+00, six feet upstream from axis. This material was approximately one per cent on the dry side of optimum moisture, and had a field cylinder penetration resistance of 1150., Original photo number: Pine R - 106
Flattening the embankment
Rolling No. 3 material after materials have been spread and the oversize rock removed with a rock rake., Original photo number: Pine R - 104