The new swimming pool in the gymnasium addition is under construction, circa 1959.
Description
The new swimming pool in the gymnasium addition was poured before most of the surrounding structure was enclosed. Photograph was taken from the south windows toward the west-northwest, ca. 1959., [Pool construction ca. 1960] cw