Vallecito Dam Construction Project

Pages

Looking across river channel toward right abutment
Looking across river channel toward right abutment from station 6+75. Timbering in test pit No. 11 is seen in partially excavated cut-off trench. Note sand deposits on each bank of the river., Original photo number: Pine R - 097
Looking across spillway
Looking across spillway from left to right at station 5+84. Grout pipe and reinforcement for cut-off wall are placed in foreground. Refer to Pine R - 312 and 316., Original photo number: Pine R - 328
Looking across spillway gate structure
Looking across spillway gate structure toward left abutment. Form and reinforcement for right span if highway bridge is seen in foreground. Refer to Pine R - 424., Original photo number: Pine R - 361
Looking across spillway stilling basin (1)
Looking across spillway stilling basin from right side opposite sta. 26+90. Note backfilling operations about counterforts in foreground., Original photo number: Pine R - 345
Looking across spillway stilling basin (2)
Looking across stilling basin from left side at sta. 28+00. Placing backfill behind counterfeited walls in foreground. Refer to Pine R - 239., Original photo number: Pine R - 414
Looking across spillway stilling basin (3)
Looking diagonally across spillway stilling basin. Note dumped riprap being placed downstream from sta. 28+00, and dragline trimming slope for riprap., Original photo number: Pine R - 431
Looking along embankment toward left abutment
Looking toward left abutment along upward slope of embankment from sta. 37+25. Slope is being trimmed to grade with a Le Tourneau scraper., Original photo number: Pine R - 117
Looking along upstream face of embankment
Looking along upstream face of embankment from right abutment. Slope is ready for riprap. Note trench at toe of slope to support the riprap., Original photo number: Pine R - 095
Looking along upstream slope of dam
Looking along upstream slope of dam from station 2+00 toward right abutment . Some hand placing is being done, to bring the riprap to grade. Note stockpile of riprap along crest of dam for use after parapet wall is placed., Original photo number: Pine R - 118
Looking at downstream slope of embankment
Looking at downstream slope of embankment from a point in the old river channel about 600 ft. downstream from axis. Slope near the crest of the dam has not been graded. Note piezometer well cover at station 11+75 in center of picture., Original photo number: Pine R - 177
Looking diagonally across stilling basin floor
Looking diagonally across stilling basin floor from right side at sta. 26+48. Concrete has been placed in the floor panel seen at lower right. Counterfort forms are being erected at left center., Original photo number: Pine R - 366
Looking downstream across spillway channel
Looking diagonally downstream across spillway channel from right side at sta. 24+00. Placing section of spillway wall in foreground., Original photo number: Pine R - 407