Looking upstream in spillway channel from station 10+50. Standards were placed in attempt to show transverse curve of floor., Original photo number: Pine R - 371
Mechanically tamping embankment against left wall of spillway inlet structure, stations 5+00 to 5+84. Elevation of fill is 7645., Original photo number: Pine R - 417
Mosaic of upstream end of Borrow Pit No. 1 looking toward the left side of the reservoir from B. P. station 60+00. A portion of Borrow Pit No. 2 can be seen across lake at right center. Note drainage channels from borrow pit to lake., Original photo number: Pine R - 174
Mosaic of upstream end of Borrow Pit No. 1 looking toward the left side of the reservoir from B. P. station 60+00. A portion of Borrow Pit No. 2 can be seen across lake at right center. Note drainage channels from borrow pit to lake., Original photo number: Pine R - 174
Panorama of dam looking downstream from a point on right side of reservoir about 1200 feet upstream from axis. (Photographic point No. 5). Downstream end of Borrow Pit No. 1 in foreground., Original photo number: Pine R - 029
Panorama of dam looking downstream from point on right side of reservoir, about 1200 feet upstream from axis - Photographic point No. 5 - Elevation of fill 7663.5., Original photo number: Pine R - 042
Panorama of damsite looking upstream from a point on right abutment about 1/4 mile downstream from dam. (Photographic point No. 2). See Pine R - 25 a&b (D003006)., Original photo number: Pine R - 112 a&b
Panorama of damsite looking upstream from a point on right abutment about 1/4 mile downstream from dam. (Photographic point No. 2). Refer to Pine R - 112 a&b (D003007)., Original photo number: Pine R - 248 a&b
Panorama of the dam looking upstream from a point on right abutment about 1/4 mile downstream from axis. (Photographic point No. 2). Refer to Pine R - 196 a&b (D003008)., Original photo number: Pine R - 322 a&b