Looking at rock excavation for right spillway wall between stations 5+00 and 5+29.89. Cut-off trench at right is at sta. 5+00., Original photo number: Pine R - 415
Rock excavation for right wall of spillway inlet structure, station 5+00 to 5+29.89. Note rock slide just above and to right of form at lower left. Refer to Pine R - 367 and 394., Original photo number: Pine R - 427
Rock quarry 6 miles upstream from the dam where riprap will be obtained. Broken rock at left is a result of the first blast., Original photo number: Pine R - 205
Rock rake constructed on bull-dozer. This rake was used to pick rock from the semi-impervious section of the embankment before the screening plant was in operation., Original photo number: Pine R - 226
Close-up of slide area shown in Pine R - 393. This material was removed and will be replaced with concrete. Refer to Pine R - 400., Original photo number: Pine R - 405
Roller No. 1 showing drawbar and gooseneck connection constructed in contractor's shop to replace the one furnished with roller, which broke., Original photo number: Pine R - 218