Contractor's haul road from Borrow Pit No. 2 to embankment looking upstream from borrow pit station 33+50/11+60. Sprinkler truck seen going away from camera has just sprinkled near side of road., Original photo number: Pine R - 189
Downstream face of cut for additional cut-off trench at station 18+00, showing cross-section of embankment placed during 1938, and the source of each type of material., Original photo number: Pine R - 310
Cut-off trench excavation from sta. 20+00 to the river. A small section of embankment is shown in the immediate foreground. The remainder of the trench is being prepared to receive embankment., Original photo number: Pine R - 151
Looking downstream in the river channel just prior to closing the temporary cofferdam. The box culvert seen at right center carried the flow of the river while the dam was completed., Original photo number: Pine R - 364