Looking downstream in Pine River showing new channel excavated by contractor to divert the river away from the spillway stilling basin. At extreme right, a portion of the power shovel can be seen excavating in the stilling basin., Original photo number: Pine R - 413
Looking downstream at entrance to diversion channel. Unsuitable material from spillway excavation is being wasted at left side of channel to be used for constructing the temporary cofferdam., Original photo number: Pine R - 329
Looking downstream at left gate pier form after reinforcement was installed, but before nose form was placed. Refer to Pine R - 347., Original photo number: Pine R - 433
Looking downstream along partially refilled temporary diversion channel from dam axis station 22+00, 95 ft. downstream from axis. Toe of cobble fill in foreground., Original photo number: Pine R - 196 a&b
Looking downstream at temporary cofferdam about 30 minutes before gate in box culvert was closed. The gate can be seen just below the dragline bucket., Original photo number: Pine R - 390
Twelve yard Euclid bottom-dump truck dumping material on the upstream No. 2 section of the embankment at sta. 24+84. this material is approximately 1.5% below optimum moisture. Note the excellent condition of the embankment for truck travel., Original photo number: Pine R - 125