View of foundation drainage installation and left abutment
Description
Looking toward left abutment from axis station 7+75 showing in foreground the installation of foundation drainage system at upstream side of cutoff trench. This installation is on the bench shown in upper left hand corner of Pine R - 157., Original photo number: Pine R - 304