Placing spillway floor panel at left side, sta. 9+70 to 10+05. Gentleman in dark suit (second from left) is A. E. Kelso, Engineer of Water Supply for Melbourne and Metropolitan Board of Works, Victoria, Australia, who was visiting the project., Original photo number: Pine R - 342