The Denver & Rio Grande Railroad stone depot was built in 1880. Although preparations began a year earlier, the third rail was laid through Salida during 1890. Addition of the outside rail allowed standard gauge as well as narrow gauge trains to operate over the entire Rio Grande system. Switches, frogs and rerailers – especially in the crowded Salida yards – were an engineering marvel. As late as 1890, the tender of this switcher is fitted with a kerosene work light.
Ernest Brownson Collection.