Excavation at right side of spillway near sta. 7+00. Le Tourneau is removing material which has been bladed off of slope with motor-grader seen in Pine R - 268., Original photo number: Pine R - 058
Motor-grader sloping right bank of spillway at sta. 7+25. Additional excavation required here because of increased width of wall footing., Original photo number: Pine R - 078
Looking toward right abutment from station 38+95 showing spillway float well supply pipe in place ready for concrete. Refer to Pine R - 430., Original photo number: Pine R - 357